A homeowner's guide

Planning a home remodel in Boulder County & Broomfield

A good plan answers three questions. What work is needed? What will it cost? How will the house run while the work happens? This guide covers each step, from your first notes to the first day of work, for homes in Boulder County, Broomfield and the Denver metro.

Find your project

Which project fits what you want to change?

Start with the problem you want to solve. These options help you choose what to discuss at the walkthrough.

Update or open up a kitchen

A kitchen remodel can keep the current layout or change how the room works. Connecting it to the living or dining room may involve structural wall removal; extending past an outside wall means an addition.

Make a bathroom work better

Compare a full bathroom remodel, a tub-to-shower conversion and a steam shower in our bathroom project options. The right scope depends on what you want to keep, the layout and whether you want steam.

Change several connected rooms

A main-floor or whole-home remodel plans rooms together when they share flooring, walls, lighting or systems. Decide whether you want to update one floor, several rooms or the entire interior, and which rooms must stay usable.

Find more living space

Basement finishing turns space below grade into rooms you can use, subject to the existing conditions. A home addition adds to the house when reworking the rooms you have will not provide enough space.

Repair or rebuild a deck

Surface wear and damaged framing need different work. Our deck repair and building guide explains what to check before choosing a repair, new decking over a sound frame or a rebuild.

Build a new home or business space

For a custom home, start with the lot and any plans you have. For a business, commercial construction covers new buildings, remodels and tenant improvements, with the scope shaped by the space and its intended use.

Write down what needs to change

Start with the problems, not the finishes. For example: two people cannot cook at once, the only full bathroom is too small, or the basement is never used. Then sort your list into must-haves and nice-to-haves.

Save photos of rooms you like. Add one line to each about what you like in it, such as "the open shelves" or "the light wood floor." That tells a contractor more than the photo alone.

Next, look past the one room. A kitchen remodel that opens to the living room can mean load-bearing wall removal, a floor that runs through both rooms and new lighting. On our Westminster main-floor remodel, we removed walls and added a structural beam. Now the kitchen, dining and living areas are one space. New hardwood floors and lighting were part of the same job.

Sometimes the rooms work fine, but the house is too small. Then a new layout will not fix it. A home addition or kitchen extension adds the space you are missing.

See the design in 3D first

Before work starts, we draw the space as a detailed 3D model, with the cabinets, appliances, island, windows and doors where they will go. It's free and included with the work. You see the plan before anything is torn out, and you can change it while it is still a drawing, not after the cabinets are ordered.

3D model of a kitchen with an L-shaped island, wall ovens, a range hood and a French-door refrigerator
A kitchen layout we drew in 3D. It's a model, not a photo.

The model covers the layout. When the plan changes the structure, such as a load-bearing wall coming out, an engineer designs the beam or framing. Additions and new homes still need a full set of plans for the permit.

What drives the cost

Room size alone does not set the price. Two kitchens the same size can differ a lot. These are the things that move the number most:

  • Moving things. Keeping the sink, toilet, shower and range where they are costs less than moving them. Moving them means new plumbing, gas lines or venting.
  • Structure. Taking out a load-bearing wall, adding a beam or fixing damaged framing can add engineering and more finish work.
  • Electrical. New circuits, more lights, or an older electrical panel that cannot carry the new load.
  • Cabinets and counters. Stock, semi-custom and custom cabinets differ a lot in price and wait time. So do counter materials.
  • Finishes. Tile, flooring, fixtures and hardware each come in a wide price range. A detailed tile pattern also takes longer to set.
  • Repairs around the work. Patching floors, walls and ceilings where an old wall or fixture used to be.
  • What is behind the walls. Old wiring, leaks or rot can turn up once the walls are open.

Pick an amount you are comfortable spending and share it at the walkthrough. Then ask what could be simpler without losing what matters most to you. Keeping plumbing where it is and using standard cabinet sizes are two common ways. Also set money aside for surprises found after demolition. Older homes and homes with past repairs tend to need more.

Compare estimates line by line

Give every contractor the same list of work and the same drawings, if you have them. Otherwise you are comparing different jobs. A lower total can mean cheaper materials, fewer rooms or steps left out. Check what each estimate includes before you compare totals:

  • Prep and cleanup: demolition, hauling debris away, and covering floors and rooms outside the work area.
  • Structure and systems: framing, beams, plumbing, electrical and venting.
  • Finishes: cabinets, counters, tile, flooring, fixtures, paint and trim, including where new floors meet old ones.
  • Who does what: who buys the materials, and who handles engineering, permits and inspections.
  • Allowances: a set amount for items not chosen yet, like tile or light fixtures. Ask what that amount buys. If one estimate uses an allowance and another prices the tile you picked, the totals are not for the same job.
  • Exclusions: what is not in the price. Appliances and painting rooms outside the work area are common examples.

If an estimate is one number with no breakdown, ask for the parts. RSRT gives you a free written line-item estimate after the walkthrough. Each part of the job has its own line, so you can see where the money goes. If the work or the price changes later, we write it up as a change order. You approve it before that work starts.

Permits and inspections

Whether a job needs a permit depends on the work and on your city or county. The usual jobs to check are changes to structure, plumbing, wiring or gas, additions, basement finishing and decks. Review times differ from place to place.

With a permit, an inspector checks the work at set stages, such as framing or rough plumbing, before the walls are closed. Ask each contractor who pulls the permit and who meets the inspector. We handle permits and coordinate inspections where required. We are licensed in Superior, Boulder, Broomfield, Arvada, Thornton, Lakewood, Littleton and other towns.

Use the official guidance for your address: Superior Planning & Building, City of Boulder building permits and inspections, Boulder County Building Safety & Inspection Services for homes outside city and town limits, or the City and County of Broomfield Building Division. A Boulder mailing address does not always mean the City of Boulder handles the permit.

Questions to ask any contractor

  • Are you licensed in my city, and are you insured?
  • Who will I deal with during the job?
  • Who does the plumbing and electrical work, and are they licensed?
  • What is in this price, and what is not?
  • How do you handle changes once work starts?
  • What warranty do you give on your work, and for how long?
  • Can I see finished jobs like mine and read reviews from past clients?
  • How will you keep dust out of the rest of the house?
  • What do you need from me, and by when?

Our answers: RSRT is licensed and insured. The owners, Alex and Sergei, do the walkthrough and stay on the job. They do the plumbing and electrical work themselves, licensed in Colorado, plus the framing, drywall, tile, paint and finish work. Roofing and concrete go to crews we work with regularly. Every estimate is written and itemized, and changes go on a written change order first. Our work comes with a 2-year workmanship warranty. You can see our finished projects and read client reviews on this site.

Plan the order of work

A few decisions have to come before the start date. A typical order looks like this:

  1. Settle the layout and the list of work.
  2. Bring in an engineer if a structural wall or beam is involved.
  3. Apply for permits.
  4. Choose and order items that take weeks to arrive, such as cabinets, windows or special-order tile.
  5. Start demolition once permits are approved and those items are on the way.

If several rooms share plumbing, wiring or one floor, doing them together in a whole-home remodel means one round of disruption instead of several. Doing one room at a time spreads out the cost and the decisions. Our complete home remodel in Boulder did it all at once: a full interior renovation with a new kitchen, new bathrooms, flooring and lighting.

Choose materials before they hold up the work

Bring a short selection list, with model numbers or product links when you have them. Mark what is decided, what still needs a price and what you intend to buy yourself. The goal is to settle choices that affect the layout before ordering and installation.

  • Kitchen: appliance sizes, cabinet layout, island seating, sink location, counters, backsplash and lighting.
  • Bathroom: shower or tub layout, vanity size, fixtures, tile, storage and glass enclosure.
  • Connected rooms: flooring transitions, doors, trim, paint and lighting that should match across the project.
  • Addition or new build: plans, windows, exterior materials and how the new space connects to existing rooms or the site.

Use finished projects to compare specific choices. Our modern Superior kitchen pairs a full-height quartz backsplash with a waterfall island. Our Broomfield walk-in shower remodel includes bench seating, a recessed niche and a double vanity. Note what you want to borrow from each example and what should be different in your home.

What to bring to the walkthrough

  • Your must-have list and your nice-to-have list.
  • Photos, rough measurements and any plans you already have.
  • A budget range and a target finish date, plus the reason for the date, such as guests coming or a planned sale.
  • Things you want to keep, reuse or buy yourself.
  • Known problems: leaks, soft or uneven floors, or past work done without a permit.
  • HOA rules, if your neighborhood has them.

You do not need finished plans to start. Alex and Sergei, RSRT's owners, do the walkthrough themselves. Use the visit to sort out what can be priced now and what needs a closer look first, such as an engineer's review of a wall.

Get the house ready

  • Pick the bathroom you will use during the work. If the kitchen is torn out, set up a microwave and a coffee maker in another room.
  • Clear the work area and the path to it. Take fragile items off shelves in nearby rooms.
  • Decide where pets and kids will stay, and which doors stay closed.
  • Agree on work hours, parking and where materials will be stored.
  • Ask when water, power or gas will be off, and for how long.
  • If you work from home, pick a quiet room away from the work.

For a big job, staying with family or in a rental for part of it can be easier. Ask which weeks will be the hardest to live through, and plan around those.

Common questions

Before you get started

Do I need a general contractor for my remodel?

Usually yes, if the job needs more than one trade or changes walls, plumbing or wiring. A general contractor puts the trades in the right order, handles permits, coordinates inspections where required and is the one person responsible for the result. That is what RSRT does on its projects.

How much will my remodel cost?

A real number takes a look at the house. Two rooms the same size can differ a lot in price, for the reasons in what drives the cost. After the walkthrough, you get a free written estimate with a price for each part of the job.

How long does a kitchen, bathroom or whole-home remodel take?

Most of our kitchens take 10-12 weeks, a hall bathroom about 2 weeks, and a basement with a bedroom and a bathroom around 10 weeks. Those are typical, not promises. Engineering, permits, material wait times and what is found once work starts all move the schedule, and a whole-home remodel depends on which rooms it covers. Ask separately about planning time and the weeks the room will be out of use. Our order-of-work list shows the steps to settle before a start date.

Do you design the remodel?

Yes, we plan the layout with you and draw it in 3D before we start, like the kitchen shown above, at no extra cost. An engineer comes in when structure changes, and an addition or a new home also needs permit drawings.

Do I need an architect to remodel my house?

Usually not. We draw the plans and handle the permit applications ourselves, for home remodels and additions alike. An engineer designs the foundation, beam or framing when the job requires it. Some cities also want the full addition plans stamped by a licensed design professional, and we check that for your address.

Do you offer financing?

Not right now. You can pay by check, ACH bank transfer, or credit or debit card.

Can I start with only a bathroom or basement?

Yes. See our bathroom remodeling and basement finishing pages, then tell us which rooms you want to change. Mention later plans too. A future basement bathroom, for example, can change where pipes go today.

Should I add on or rework the space I have?

If the rooms are big enough but do not work well, a new layout or removing a wall may solve it. If the house is too small, look at home additions. Ask about both at the walkthrough.

What if I am planning a new home instead?

Start with the lot. Tell us what plans or drawings you already have, and at the walkthrough we explain what the job still needs. A new build adds site work and utility hookups that a remodel does not have. See custom home building and the custom home we built in Arvada.

Do you work on business spaces too?

Yes. RSRT holds a commercial contractor license and takes on new commercial construction as well as commercial remodels and tenant improvements. We confirm licensing for the town your project is in. A commercial job follows the same steps: a clear list of work, permits and a line-item estimate. See commercial construction.

Free estimate

Tell us what you want to change

Send your list and a few photos. We usually reply within a few hours, set up a walkthrough and follow up with a free written line-item estimate.