Basements · Bedrooms · Baths

Basement finishing in Broomfield & Boulder County

Turn an unfinished basement into bedrooms, a bathroom, an office or a media room that feels like part of the house. At the walkthrough we check ceiling height, where the furnace, water heater and ducts sit, and whether a bedroom needs an egress (escape) window. We handle permits and coordinate inspections where required.

  • Licensed & insured
  • 2-year workmanship warranty
  • Written line-item estimate
  • Permits when required
Side view (cross-section) of a house with a finished basement: a bedroom with an egress window and window well, a bathroom, a utility room with the furnace and water heater, and a media room with stairs up to the main floor Main floor Bedroom egress window Bath Utility Media room
Side view of a finished basement, drawn as a cross-section.
What's included

What basement finishing includes

A finished basement is a small remodel of its own: layout, framing, trades and finish, all below grade.

Layout planning

Where bedrooms, a bath and open space go depends on the windows, the stairs, the mechanical room and where the drains are.

  • Bedrooms, offices, gyms
  • Room for storage

Framing & insulation

Walls, soffits around ducts and beams, and insulation on the exterior walls.

  • Soffits around ducts
  • Insulated exterior walls

Bedrooms & egress

A basement bedroom needs an emergency escape opening, usually an egress window with a window well. We check this first.

  • Egress windows & wells
  • Head-height checks

Bathrooms & bars

A full or half bath and a wet bar. Drain location matters, and some basements need a pump to reach the sewer line.

  • Full & half baths
  • Wet bars

Electrical & low-voltage

Circuits, recessed lighting and outlets, coordinated with your low-voltage or AV installer if you have one.

  • Recessed lighting
  • Media & network wiring prep

Drywall, doors & floors

Drywall, doors, trim and flooring, so the space feels like part of the original house.

  • Flooring for below grade
  • Trim to match upstairs
Before framing

Planned in 3D before we start

Whether it's a first finish or a basement remodel, we draw the space as a detailed 3D model, free and included with the work, so you see the layout before we frame a single wall. That is the easy time to move a door, resize a bedroom or rethink the bar.

3D layout model of a basement with bedrooms, a bathroom with a freestanding tub, a wet bar and a family room
A basement layout we drew in 3D. It's a model, not a photo.
Recent basements

Basements we've finished

Open any project to see every photo.

See all projects
How it works

How basement finishing works

You see the scope and the price in writing before work starts.

  1. Walkthrough

    We look at ceiling height, egress (escape) windows, where the furnace, water heater and ducts sit, and any signs of moisture before you commit to anything. Walkthroughs typically take 30-45 minutes.

  2. Written line-item estimate

    Framing, electrical, plumbing, egress, drywall and flooring as separate lines, so you can see what each room costs.

  3. Permits

    In Boulder County, Broomfield and Thornton a basement finish usually needs a building permit, and Thornton publishes its own guide for single-family basement finishes. We coordinate permits and inspections when required.

  4. Build & inspections

    Framing, rough plumbing and wiring, inspections, insulation, drywall, then finish. The owners frame, plumb, wire and hang the drywall themselves, then our own painting crew paints the walls, ceilings and trim. We keep you updated around inspections, and changes get a written change order.

Cost & timeline

Basement finishing cost and timeline

Basements vary more than their square footage suggests, so we don't publish prices. Your estimate is itemized, so you can see what each room and choice adds. The main things that move the number:

  • Rooms and layout. An open rec room costs less than the same space split into a bedroom, an office and a bath.
  • Plumbing. A bathroom or wet bar adds plumbing, and more if the drains sit below the sewer line and need a pump.
  • Egress. If a bedroom needs a new egress window, that means cutting the foundation wall and digging a window well.
  • Head height and obstacles. Low ducts, beams and pipes need soffits or rerouting, which adds framing and trade work.
  • Moisture. Any water problem has to be fixed before walls go up. Finishing over it just hides it.

A basement with a bedroom and a bathroom takes around 10 weeks. Every job is different, so read that as typical, not a promise. We keep you posted on the schedule, especially around each inspection.

Setting a basement budget? Our remodel planning guide explains what moves the budget and how to compare estimates line by line.

What we check before you commit

Egress for any bedroom, ceiling height under ducts and beams, access to the furnace, water heater, electrical panel and sump or radon system, and signs of moisture on the walls and floor. Flagging these at the walkthrough helps identify work that needs to be included in your estimate.

Basement permits in Broomfield and Boulder

When a basement finish needs a permit, it goes to whichever office covers the address. In Broomfield, that's the City and County of Broomfield Building Division. In Boulder, it's the City of Boulder for a home inside city limits, or possibly Boulder County Building Safety & Inspection Services for one outside them. Either way, we handle the permit and schedule the inspections with that office.

Client reviews

What clients say about their basements

Read all reviews
Rated 5 out of 5

RSRT finished our unfinished basement and turned it into the most used part of our house. Framing, bathroom, bar, and an office were all done exactly how we talked about during the walkthrough. Alex kept us updated around inspections so nothing was a surprise. Clean crew, no drama, and the end result looks like it was always part of the house

Sarah M
Rated 5 out of 5

From the first walkthrough it was obvious Alex knew basements. He flagged egress, head height, and mechanical issues before we signed anything. The finished space has a bedroom, a media room, and a small workout area. The inspections and paperwork were all handled, and they coordinated with our low-voltage guy without stepping on toes. The basement doesn’t feel like an afterthought - it feels like part of the original house.

Trevor L
FAQ

Basement finishing questions

Something else on your mind? Call (720) 392-4297 or ask in your estimate request.

Does a basement bedroom need an egress window?

Building codes generally require an emergency escape opening in a basement sleeping room, usually an egress window with a window well. If there isn't one where a bedroom would go, adding it becomes part of the plan. We check at the walkthrough and confirm requirements through the permit.

Can you add an egress window to an existing basement?

Yes. We cut the new opening in the foundation wall, set the window and the window well, and handle the permit and inspection. If a new bedroom depends on it, we look at where the window can go during the walkthrough.

Do I need a permit to finish my basement?

Usually, yes. Finishing a basement typically involves framing, electrical and often plumbing, which commonly require a permit. We coordinate permits and inspections when required.

Can you add a bathroom in the basement?

Yes. Existing rough-in plumbing makes it simpler. Without it, we look at where the drains run, and if they sit below the sewer line, a pump may be needed.

Do you remodel basements that are already finished?

Yes. A basement remodel starts the same way as a first finish: a walkthrough, then the new layout drawn in 3D before any walls change. If a room becomes a bedroom and has no egress window, we cut a new one into the foundation.

Do you hire out the electrical and plumbing?

No. We do the electrical and plumbing ourselves and hold Colorado licenses for both, along with the framing, drywall and finish work. That means fewer hand-offs between trades. If the job needs concrete work, it goes to a concrete crew we work with regularly.

What about low ceilings, ducts and beams?

We measure head height at the walkthrough. Low ducts and beams are usually boxed in with soffits, and sometimes they can be rerouted. We'll tell you what's realistic before you commit.

Can you work with my own AV or low-voltage installer?

Yes. We coordinate with your installer so their wiring goes in at the right stage, before drywall.

How much does it cost to finish a basement?

It depends on the rooms, plumbing, egress and finish level, so we don't quote from a price list. You get a written line-item estimate after the walkthrough.

How long does it take to finish a basement?

Around 10 weeks for a basement with a bedroom and a bathroom. No two basements are alike, so that is a typical time, not a promise. Permit review, inspection dates and material wait times move it the most, and we tell you when the schedule shifts.

Should we finish the basement or build an addition?

If you need a bedroom, office or family room, an unfinished basement may provide the space within the house you already have. We check moisture, ceiling height, bedroom egress and plumbing before deciding what fits. If you need more space on the main floor or a bigger kitchen, compare a home addition or kitchen extension. The walkthrough and line-item estimate help you weigh the options.

Can a finished basement be its own apartment?

It can. Once a basement gets a kitchen and an entrance of its own, your city may treat it as an accessory dwelling unit (ADU), and its ADU rules then apply along with the building code, which still calls for egress from every bedroom. We check your city's rules before the layout is drawn. See basement apartments and other ADUs for what Colorado's 2024 ADU law changed.

Free estimate

Finishing your basement?

Tell us what rooms you want and add a few photos of the space. We'll set up a walkthrough and follow up with a written line-item estimate.