Kitchens · Layouts · Islands

Kitchen remodeling in Superior, Louisville & Boulder

Full kitchen remodels, from a new island and cabinets to taking out a wall to open the room up. You work directly with the owners and get a written line-item estimate before anything starts.

Compare kitchen remodeling options: keep the layout, open up the room or make the kitchen bigger.

  • Licensed & insured
  • 2-year workmanship warranty
  • Written line-item estimate
  • Permits when required
Remodeled kitchen in Westminster, Colorado with a navy island, white quartz counters, white shaker cabinets and a wood-wrapped post and beam Main-floor remodel · Westminster
Choose the scope

Which kitchen remodel fits your home?

Start with what does not work about the kitchen today. The biggest difference is whether you keep the layout, change the walls or add floor area.

Remodel with the same layout

If the room works but the finishes and storage do not, a remodel can replace cabinets, counters, backsplash, lighting and flooring while keeping the sink and range in place. Keeping those locations can reduce plumbing and venting changes. The estimate still checks the wiring, connections and condition behind the finishes. If the cabinets are still solid, our own crew can paint them a new color instead of replacing them. See cabinet painting.

Open-concept kitchen remodel

If a wall separates the kitchen from the dining or living room, opening it can connect the spaces without adding onto the house. In our Alma kitchen in Superior, we took out the wall where the bay window ends and the wall cabinets begin. Our Superior open-concept kitchen included load-bearing wall removal and new structural supports. See what structural wall removal involves.

A bigger kitchen or an addition

Taking space from a neighboring room may make the kitchen bigger inside the existing house, as in our Superior kitchen extension. If the plan moves an outside wall to add floor area, it is a kitchen addition or bump-out. That changes the plans, structure and permit scope.

Changing the adjoining rooms too? Compare main-floor remodeling. For help setting priorities, use the remodel planning guide.

What's included

What a kitchen remodel covers

Most of our kitchen work is full remodels. You decide the scope; this is what it usually involves.

Demo & protection

The old kitchen comes out and the rest of the house stays protected, including floors, doorways and the rooms you still live in.

  • Floor and doorway protection
  • Dust control during demo

Layout & structure

Moving the sink, adding an island, opening the kitchen to the next room or making it bigger with space from inside the house. If a wall carries load, a beam replaces it.

Cabinetry & counters

New cabinets, including custom cabinetry, with quartz counters, waterfall island ends or a full-height backsplash.

  • Painted and two-tone finishes
  • Open shelving
  • Quartz & waterfall edges

Plumbing, electrical & lighting

Sink and appliance hookups, new circuits where appliances need them, and recessed and pendant lighting. We do the plumbing and electrical ourselves, licensed in Colorado.

  • Appliance circuits
  • Recessed & pendant lights

Tile, floors & finish

Backsplash tile, hardwood or tile floors that run into the next room, and the trim and paint that tie it together.

  • Herringbone & patterned tile
  • Hardwood & white oak floors
  • Trim & paint

Doors & openings

A new sliding patio door or a wider opening can change how much light a kitchen gets and how it connects to the yard.

  • Patio door upgrades
  • Sliding barn doors
Recent kitchens

Kitchens we've finished

Real kitchen projects from Superior, Louisville, Boulder and nearby Colorado communities. Open any project to see every photo.

Compare the full-height quartz backsplash and waterfall island in our modern Superior kitchen with the two-sided island seating and blue-gray hex tile in our Louisville kitchen remodel. These finished projects show different ways to plan cabinets, counters and gathering space.

See all projects
How it works

From walkthrough to finished kitchen

You see the scope and the price in writing before work starts.

  1. Walkthrough

    We look at the kitchen, talk through what you want to change and note anything that affects the plan. Walkthroughs typically take 30-45 minutes.

  2. Written line-item estimate

    Demo, cabinets, counters, tile, electrical and the rest as separate lines, so you can see where the money goes and adjust.

  3. Permits & ordering

    We coordinate permits when the work requires them and plan the schedule around cabinet and counter lead times.

  4. Build & inspections

    You talk directly with Alex and Sergei. Inspections happen as each stage is ready, and any change gets a written change order first.

Cost & timeline

Kitchen remodel cost and timeline

Every job is different, so take these as typical numbers, not a quote or a promise: most of our kitchens take 10-12 weeks, and the average all-in budget is about $120,000, with materials and labor included. Your written line-item estimate is the real number for your kitchen.

Two kitchens of the same size can still be very different jobs. Your estimate is itemized, so you can see what each choice adds. The main things that move the number:

  • Layout changes. Keeping the sink, range and fridge where they are costs less than moving them. Moving plumbing, gas or venting adds labor and can add permits.
  • Structural work. Taking out a load-bearing wall adds a beam, engineering when the job requires it, and more finish work. See load-bearing wall removal.
  • Cabinets and counters. Stock, semi-custom and custom cabinetry vary widely in cost and lead time. Waterfall ends and full-height slab backsplashes add fabrication.
  • Tile and floors. Patterns like herringbone take longer to set than a simple layout. Running new flooring into the next room adds area.
  • What's behind the walls. Older homes can hide wiring, venting or framing that needs fixing once walls are open. If that happens, you see it on a written change order before we do the work.

How long yours takes mostly depends on permits (when required), how long cabinets and counters take to arrive, and inspection scheduling. Counters are usually measured once the cabinets are in, so there is a wait between the two. We keep you posted on the schedule as it moves.

Setting a kitchen budget or comparing bids? Our remodel planning guide shows how to compare estimates line by line.

Permits and inspections

Kitchen remodels often include electrical, plumbing, gas or structural changes that need a permit. Whether yours does depends on the scope and your city. We coordinate permits when required, schedule inspections as each stage is ready, and do the work to code.

Client reviews

What clients say

Read all reviews
Rated 5 out of 5

We wanted to open up our kitchen to the living room and kept getting vague answers from other contractors about ‘maybe needing a beam’. RSRT brought in an engineer, installed the LVL, and handled all the drywall and finish work so you’d never know a wall used to be there. The new kitchen layout is exactly what we sketched out, and they stayed on top of dust control so we could live in the house during the work.

Emily H
Rated 5 out of 5

We bought a 90s house that needed everything on the main floor updated. RSRT handled wall removals, new LVL beams, kitchen re-layout, flooring, and trim. We always knew what was happening the next week and any changes were written down with clear pricing. Inspections passed the first time and the crew was respectful of our neighbors. The house feels brand new without weird shortcuts hiding behind paint.

Michael R
FAQ

Kitchen remodeling questions

Something else on your mind? Call (720) 392-4297 or ask in your estimate request.

How much does a kitchen remodel cost?

Every job is different and no number is guaranteed, but our average kitchen comes in at about $120,000 all-in, with materials and labor included. Layout changes, cabinets, counters and what we find behind the walls move it up or down. After the walkthrough you get a written line-item estimate, and that is the real number for your kitchen. The estimate form has an optional budget range if you'd like to share yours up front.

How long does a kitchen remodel take?

Most of our kitchens take 10-12 weeks. Every job is different, so treat that as typical, not a promise. Permits (when required), cabinet and counter lead times and inspection dates set the pace, and counters are usually measured once the cabinets are in. We keep you posted on the schedule as it moves.

Do you handle the whole kitchen?

Yes. Most of our kitchen work is full remodels, from demo through cabinets, counters, tile, floors, lighting and paint. Alex and Sergei do the plumbing, wiring, cabinet install, tile and finish work themselves. That means fewer hand-offs and one point of contact: the owners.

Can you open the kitchen to the living room?

Often, yes. Several of our kitchens started with a wall removal. If the wall is load-bearing, a beam sized for the load replaces it, with engineering and permits when required. More on wall removal.

Can we live in the house during the remodel?

You can, and clients have. We protect floors and doorways and keep dust contained, but you'll be without a working kitchen for part of the project. A temporary setup with a fridge, a microwave and access to a sink makes that much easier.

Do you help choose materials and finishes?

Yes. We help you sort out layout and finish decisions and explain where spending more makes a real difference and where it doesn't. Before work starts, we also draw your kitchen in 3D, free with the job, so you can see the layout; our planning guide shows an example.

Which towns do you remodel kitchens in?

We're based in Thornton and remodel kitchens across Boulder County and the Denver metro. More of our finished kitchens are in Superior than in any other town. We have also remodeled kitchens in Louisville and Boulder, opened up a kitchen and main floor in Westminster and redid a kitchen and two baths in Erie. We take kitchen jobs inside Denver too. Send your address with your estimate request and we'll confirm we cover it.

Free estimate

Planning a kitchen?

Tell us what you want to change and add a few photos. We'll set up a walkthrough at your home and follow up with a written line-item estimate.